|
Comal ISD Elementary School,
Bul Verde, Texas

Under contract to Comal ISD, LAI
performed
site design and permitting
for a new 800-student elementary school
in Bulverde, Texas
at the Johnson Ranch development. This 16-acre
site,
located
in the Edwards Aquifer recharge
zone, required permitting
through TCEQ and the City of
Bulverde. Loomis Austin coordinated closely with the architect and performed
site
design including grading, drainage and water quality along with
utilities coordination. The
school is scheduled to
open in the Fall of 2009.
Services Provided:
- Bid Phase Services
- Boundary Survey
- Construction Plans Development
- Construction Phase Services
- Cost Estimating
- Design Survey (Tree & Topo)
- Drainage Study
- Drainage Design
- Final Platting
- Flood Detention Design
- Offsite Utilities Assessment/Design
|
|
- Parking Design
- Preliminary Engineering
- Site Grading Plan
- TCEQ Wastewater Permitting
- Utilities Coordination
- SWPPP
- Wastewater Collection System Design
- Water Distribution System Design
- Water Pollution Abatement Plan
- Water Quality Facility Design
|
|