San Marcos High School, San Marcos, Texas

LAI provided site engineering and permitting through the City of San Marcos for the new 2,600-student San Marcos High School located on County Road 266 in San Marcos, Texas. Project management duties included comprehensive coordination with San Marcos ISD and the project architect. Site engineering included extensive parking and site access design with challenging utilities coordination and flood detention systems planning and design.  

Services Provided:

  • Boundary Survey
  • Construction Plans Development
  • Construction Phase services
  • Construction Staking
  • Design Survey (Tree & Topo)
  • Drainage Study
  • Drainage Design
  • Endangered Species Assessment
  • Environmental Site Assessment
  • Flood Detention Design
  • Land Title Survey
  • Landscape Planning
  • Offsite Utilities Assessment/Design
 
  • Parking Design
  • Pre-Con Meetings/Punch Lists
  • Roadway Design
  • Site Grading Plan
  • Site Development Permitting
  • Subdivision Application & Permitting
  • Utilities Coordination
  • SWPPP
  • Wastewater Collection System Design
  • Water Distribution System Design
  • Water System Modeling
  • Wetlands Assessment