NewsAbout Loomis AustinServicesProjectsNewsContact Us

Projects: Water and Wastewater Systems

Town of Starbuck, Washington

Loomis Austin was selected by the town of Starbuck, Washington (population ~200) to plan, design, and oversee construction for a centralized wastewater collection, treatment, and disposal system to replace outdated septic systems on small lots.  LAI designed more than 2 miles of a STEP/STEG sewer collection system along with a 20,000 gpd treatment and drip irrigation system.

Services Provided:

  • Bid Phase Services
  • Construction Plans Development
  • Construction Phase Services
  • Cost Estimating
  • Design Survey (Tree & Topo)
  • Preliminary Engineering
 
  • Presentations at City Council/P & Z
  • Project Management
  • Wastewater Collection System Design
  • Wastewater Disposal System Design
  • Wastewater System Planning
  • Wastewater Treatment Plant Design