![]() |
||||||
| |
||||||
Projects: Water and Wastewater SystemsTown of Starbuck, Washington
Loomis Austin was selected by the town of Starbuck, Washington (population ~200) to plan, design, and oversee construction for a centralized wastewater collection, treatment, and disposal system to replace outdated septic systems on small lots. LAI designed more than 2 miles of a STEP/STEG sewer collection system along with a 20,000 gpd treatment and drip irrigation system. Services Provided:
|
||||||
|
Back to Water & Wastewater Systems Projects Home About Services Projects News Contact Us
ENGINEERING SUCCESS - FROM CONCEPT TO COMMUNITY
|
||||||